No 7 Tom Rolt rolls into Dolgoch station with the morning up train. 2003_09_196.jpg 95.67 Kb
|
Tom Rolt departs from Dolgoch with a train for Abergynolwyn and Nant Gwernol. 2003_09_197.jpg 111.68 Kb
|
An up train heads towards Quarry Siding through the woods, just east of Dolgoch station. 2003378.jpg 84.32 Kb
|
A changing Wharf station. Preparations are underway for the redevelopment of the Narrow Gauge Railway Museum. 2003_09_199.jpg 42.78 Kb
|
No 1 Talyllyn approaches Ty Mawr bridge with the up Quarryman service. 2003_09_200.jpg 44.37 Kb
|
Heading up the Fathew Valley, Talyllyn and train head for Hendy. 2003_09_201.jpg 31.86 Kb
|
Talyllyn rolls into the loop at Brynglas with the up Quarryman. 2003_09_202.jpg 53.45 Kb
|
Fletcher Jennings No 1 Talyllyn runs into Brynglas loop. 2003379.jpg 93.18 Kb
|
|
After taking the Brynglas to Quarry Siding token, Talyllyn pulls away from Brynglas over the level crossing. 2003_09_203.jpg 62.69 Kb
|
Rebuilt Andrew Barclay No 7 Tom Rolt rolls down towards Rhydyronen station past Tynllwyn farm. 2003380.jpg 79.81 Kb
|