143 runs into Caernarfon station with the rolling stock for the morning non-stop train to Rhyd Ddu. 2005_09_119.jpg 70.66 Kb
|
The Llanberis Lake Railways Elidir is seen outside the carriage shed at Dinas. 2005_09_121.jpg 139.37 Kb
|
143 sets back after taking water at Caernarfon. 2005_09_124.jpg 163.86 Kb
|
143 departs from Caernarfon with the Phase 4 Launch train at 12:00 on the Sunday. 2005_09_127.jpg 82.24 Kb
|
143 emerges from under Pont Wernlasddu with the Phase 4 Launch train. 2005_09_129.jpg 146.21 Kb
|
143 crosses the valley floor at Castell Cidwm with the Phase 4 Launch mixed train. 2005_09_130.jpg 121.75 Kb
|
143 climbs towards Snowdon Ranger with a collection of volunteers in the wagons at the rear. 2005_09_132.jpg 73.14 Kb
|
Another view of the phase 4 launch train heading towards Snowdon Ranger. 2005_09_133.jpg 76.14 Kb
|